Decision Maths Algorithms

Implementation of decision mathematics algorithms with Python

Introduction

Decision Mathematics is an interesting module in the A-Level Mathematics and Further Mathematics curriculum. Unlike the traditional pure mathematics module or statistics module, decision mathematics focuses on algorithmic thinking and graph theory, a branch of mathematics not quite often seen in high school curriculums.

It was also a matter of coincidence that I began to teach this module. After a year of teaching or two, I became familiar with how the simple algorithms work in theory, but I always felt that there was something missing unless I could implement these algorithms with computer programs. This is because that the students studying Decision Mathematics are not expected to write a single line of code. Instead, they are expected to turn themselves into a human computer and carry out the algorithms with pen and paper. I have wanted to turn the theories into codes for quite a long time.

I did not have the skills to do this until I finished reading a nice book on algorithms and data structures written by Bradley N. Miller and David L. Ranum. Greatly inspired by the problems and the example codes in the book, I began to have some idea on how I could possibly implement the algorithms on graphs with Python.

This was basically how the project started. I tried to build everything from scratch without using any third-party library. Starting with self-defined classes for Vertex and Edge, I managed to further create classes for Graph and Network. By recording the information about how the vertices are interrelated using lists and dictionaries, I was able to realize several key algorithms in decision mathematics including:

  • Dijkstra’s algorithm to find the shortest path from a start vertex to any vertex on a graph
  • Route inspection algorithm to find the length of the shortest route to traverse all edges on a graph
  • Critical path analysis to time manage an activity network

The codes are definitely not elegant by any standard, but at least they worked. The later improved program can also provide machine solutions that satisfy the requirements of the Decision course marking schemes.

Screenshots

Here are some solved problems from the Pearson Edexcel WDM11/01 past papers.

Using a self-defined class, Graph, the information of the graph to be solved is fed into the program.
Calling the Dijkstra's method to find the shortest path from one vertex to any other vertex.
Calling the route inspection method to find the shortest route to traverse every edge on the graph given the start and finish vertices.
Entering the information of an activity network into the program.
Solving the early start time, late finish time and total float time for all the activities, and determining the minimum completion time for the project.
Plotting the Gantt diagram based on the information found and determining the minimum number of workers needed to complete the project in shortest possible time.

Download

The project is hosted on https://github.com/yuhao-yang-cy/sci-simulations/tree/main/Decision%20Mathematics.

This work is offered under a CC BY-NC (Creative Commons Attribution-Non-Commercial) license. You may remix, adapt, and build upon this work, as long as the attribution is given and the new work is non-commercial.